Tuesday, 9 November 2010

Last board built

The final board needed for the rearranged layout has now been constructed. This is the link board that connects the exchange sidings to the lift-out Rheidol Bridge, and also will contain the lower end of the coaling stage ramp.

Now where did I put those N-gauge rail joiners?

No comments:

Post a Comment